Reduce your capital costs for wet end equipment by

  • Simplifying the process

  • Properly sizing wet end equipment

  • Extending the life of certain existing equipment

Simplifying the Process Stoneleigh Specialty Services, LLC: Paper Machine & Equipment Consultants Consulting Improve Improving Productivity Efficiency Rebuild Contaminant Removal Wet End Hydrocyclones Headbox Recycled Fiber Basis Weight Cleaners Screens White Water Fourdrinier

The “industry standard” wet end design has made several evolutions over the last forty years. Some of these process designs have used extra pumps and tanks, elaborate piping, and unnecessarily complex control schemes. Eliminating this unnecessary equipment can save capital and conserve valuable space. Eliminating unnecessary equipment often reduces operating costs, reduces maintenance expenses, and improves productivity. Stoneleigh’s experience can help you find practical ways to simplify your process so you can reduce your capital expenditures while increasing machine efficiency.

Properly Sizing Wet End Equipment

Properly sized wet end equipment enhances machine performance, promotes quality, and still leaves room for normal capacity growth. All design teams strive to achieve proper equipment sizing. Stoneleigh Specialty Services, LLC: Paper Machine & Equipment Consultants Consulting Improve Improving Productivity Efficiency Rebuild Contaminant Removal Wet End Hydrocyclones Headbox Recycled Fiber Basis Weight Cleaners Screens White Water Fourdrinier

However, thirty percent of cleaner systems and fifteen percent of headboxes are substantially oversized. Oversized equipment wastes capital, wastes energy, consumes valuable space, and often complicates the rest of wet end design. The unintended installation of oversized equipment is the most common cause of serious startup difficulties from wet end rebuilds. The typical wet end design process does not always produce satisfactory results.

Experience has shown that the installation of this oversized equipment generally comes from substantial and unrecognized headbox slice flow measurement errors, inadequate capacity analyses, and fundamental system design errors. These same errors can also lead to the premature replacement of otherwise usable equipment.

Careful measurements and analyses by an experienced specialist can help you avoid these very expensive pitfalls. Stoneleigh Specialty Services, LLC: Paper Machine & Equipment Consultants Consulting Improve Improving Productivity Efficiency Rebuild Contaminant Removal Wet End Hydrocyclones Headbox Recycled Fiber Basis Weight Cleaners Screens White Water Fourdrinier

Extending the Life of Existing Equipment

Expensive process equipment is sometimes replaced for insufficient capacity, when the symptoms of capacity limits actually arise from operating problems in other equipment. Identifying and correcting these operating problems can avoid these large and unnecessary capital expenditures.

How Stoneleigh Can Help You Invest Capital Effectively

  • Feasibility studies

  • Specialized design services for machine upgrades

  • Headbox slice flow surveys

  • Capacity analyses

  • Troubleshooting services Stoneleigh Specialty Services, LLC: Paper Machine & Equipment Consultants Consulting Improve Improving Productivity Efficiency Rebuild Contaminant Removal Wet End Hydrocyclones Headbox Recycled Fiber Basis Weight Cleaners Screens White Water Fourdrinier

Stoneleigh’s specialized engineering services can help you invest capital more effectively.

Contact Us:
740.779.3526

Stoneleigh Specialty Services
P.O Box 1939
Chillicothe, Ohio 45601-5939


Copyright © 2005 Stoneleigh Specialty Services, LLC  ::  Web Design:  www.bluelaserdesign.com